Patio Cover Removal and Stucco Repair

The client needed to tear down the old patio cover because it was too close to some electrical wires. He hired The ZenMen for the demolition and all the repair work.

Linda Vista, San Diego.

July 13, 2026

How the House Looked When We Started

Existing peaked patio roof over the seating area, seen from the front, by The ZenMen
Existing wood plank patio ceiling with recessed lights and a ceiling fan over stacked chairs, by The ZenMen

The old patio cover needed to come down because it was too close to some electrical wires.

July 15, 2026

Starting to Take the Roof Down

Patio roof mid-work with the ceiling opened, ladders, and debris in the driveway, by The ZenMen
Patio roof framing and OSB sheathing in progress, with crew members on the deck, by The ZenMen

The ZenMen began tearing down the old patio cover.

July 16, 2026

When the Roof Was Torn Down

Patio roof removed, with a debris pile in the driveway and a crew member on a ladder seen from behind, by The ZenMen

The old patio cover was taken down.

July 17, 2026

How It Looked After the Roof Was Removed

Stacked chairs on the patio under open sky after the old roof was removed, with the torn roof edge visible above the window, by The ZenMen

When the patio cover came down, two columns that had supported it were left near the driveway. The stucco and roof that had been attached to the old cover also needed to be repaired.

July 17, 2026

In Process

Stucco column mid-work after the patio roof was removed, by The ZenMen

The crew rebuilt and re-stuccoed the two columns, and repaired the stucco that had been attached to the old patio cover.

How It Came to Look

Finished patio roof and fascia over the seating area, with stacked chairs still in place, by The ZenMen
Close view of the finished patio roof soffit and stucco, by The ZenMen
Finished patio roof, soffit, and stacked chairs, by The ZenMen
Front view of the finished patio roof, columns, and gate, by The ZenMen
Finished stucco column beside the patio, by The ZenMen

The two columns were rebuilt, re-stuccoed, and painted to match an existing column. The team also stuccoed underneath the eaves to match the rest of the home, and added a new 12-foot piece of fascia board at the peak of the roof. The stucco was very difficult to match, and both the team and the customer were very happy with how it turned out.